Planning Application

The planning application for Q1 can be downloaded below.

This application has now been approved by Boston Borough Council. Read more here.

 

Application Form

 

Covering Letter

 

Design & Access Statements

– Mixed Use Design & Access Statement

– Community Stadium Design & Access Statement

 

Environmental Statement – Non Technical Summary

 

Environmental Statement – Volume 1

– 1. Introduction

Appendix 1.1 Signet Scoping Report:

Appendix 1.2 BBC Scoping Opinion:

– 2. Existing Site & Surroundings

Figures:

– 3. Proposed Development

Appendix 1.2:

Figures:

– 4. Structure & methodology

Table 4.1:

– 5. Alternatives Considered

Appendices:

– 6. Planning Policy Context

– 7. Socio Economic Effects

Appendices:

– 8. Landscape and Visual Impact

Figures:

Appendices:

– 9. Flood Risk & Drainage

– 10. Transport

– 11. Historic Environment

Figures:

– 12. Ecology

– 13. Noise

– 14. Air Quality

Figures:

Appendices:

– 15. Lighting

Figures:

Appendices:

– 16. Ground Conditions

– 17. Cumulative Effects

 

Environmental Statement – Volume 2

– Air Quality

– Ecology

– Flood Risk & Drainage

– Ground Conditions

– Historic Environment

– Noise

– Transport

Transport Assessment:

Appendices:

 

Planning Statement 

Appendices:

 

Plans

– Indicative Masterplan

– Site Location Plan

– Stadium Plans

Stadium 3D Visuals

– Vehicular Access Plans

 

Retail and Commercial Leisure Report

 

Statement of Community Consultation